Mueller Factory Fire Remediation 
Mueller Factory Fire Remediation
Mueller Europe Limited
2008 - 2009
Manufactoring
Bilston, West Midlands
Buildings
On 9 November 2008 a fire swept through the Eastern section of Mueller Europe Limited’s factory at Bilston in the West Midlands. The fire damaged or contaminated machinery, equipment, and stocks of copper tubing, across almost half of the production facility. Although the severely damaged area was limited, the extent of contamination meant that the facility had to cease production. However, just six weeks later on December 8th Mueller was able to resume production and in nine weeks the remaining factory area, untouched by the fire; was fully operational.
Royal Haskoning was appointed to determine the overall extent of the demolition work needed to restore the factory, design all of the necessary replacement civil and structural engineering works, and tender the works on behalf of Mueller. Royal Haskoning was also asked to act as the overall Construction, Design and Management (CDM) Coordinator for the project.

Contact

Peter Wood
+44 (0)1733 336529
Send email

Learn More